A better weekend timetable for Long Island riders
Modeled results at a glance
Option A: Cost-neutral redesign
- passenger-hours saved per year
- 177,000
- Estimated for the cost-neutral timetable redesign.
- of passengers save more than 8 minutes
- 25%
- Estimated per-trip benefit in the cost-neutral scenario.
Option B: Existing schedule + eight express trips
- passenger-hours saved per year
- 148,000
- A separate scenario adds eight express trips to the current schedule.
- of existing trips kept
- 100%
- Eight express trips added without changing the existing schedule.
Ontra estimates from the proof of concept; not validated by LIRR and not measured outcomes of an implemented timetable. The redesign and added-express-trip figures describe separate scenarios.
Ontra evaluated weekend timetable alternatives for LIRR’s Huntington and Ronkonkoma branches, identifying opportunities to shorten passenger journeys within operating constraints.
The challenge: improve journeys within a working railway
A timetable shapes more than departure times. Stopping patterns, connections, and the spacing of trains determine how long a passenger’s journey takes. Improving one trip also has to fit the wider service and its operating constraints.
During an eight-week Transit Tech Lab proof of concept, Ontra worked with LIRR on weekend service for the Huntington and Ronkonkoma branches. The objectives were to reduce passenger travel time, improve schedule regularity, and identify changes that would be practical to implement.
The approach: evaluate timetables against passenger demand
Ontra brought together LIRR GTFS data, timetables, station-to-station demand, run-time and dwell assumptions, stop patterns, and service constraints. These inputs supported the generation and evaluation of alternative weekend timetables.
The analysis considered both a cost-neutral redesign and a more incremental option: preserving the current schedule and adding eight express trips. Keeping the scenarios separate lets planners compare the scale of a change alongside its estimated passenger benefit.
The results: two paths to shorter trips
For the cost-neutral redesign, Ontra estimated that 25% of passengers could save more than eight minutes per trip, totaling about 177,000 passenger-hours annually.
The alternative that adds eight express trips to the existing schedule was estimated to save about 148,000 passenger-hours per year. Preserving the existing schedule gives planners a lower-disruption option to compare with the broader redesign.
What this gives planners
The proof of concept provides a way to compare timetable options through passenger impacts as well as service constraints. It gives planners a concrete basis for discussing a broader redesign alongside lower-disruption changes before deciding what to advance for further review.